Mezzanine platform and access stairs
A 96 square metre storage mezzanine with stairs and handrail, installed over a working workshop floor without stopping p...
View projectEighteen 14-metre trusses fabricated to engineer drawings, marked up for erection and delivered in the sequence the programme needed.
An 1,100 square metre warehouse needed eighteen trusses at a 14-metre span, plus purlins and bracing. The contractor had been let down on a previous job by steel that arrived unmarked and out of sequence, which cost them crane days.
We built the trusses on a jig so every one came out identical, returned shop drawings for approval before cutting, and marked each section to match the drawing.
Eighteen identical long-span trusses, on a programme where crane hire was booked by the day. A previous supplier had delivered unmarked steel out of sequence, costing the contractor two crane days.
Shop drawings approved before cutting. Trusses jigged so every unit was interchangeable, every section stencilled to match the drawing, and delivery split into three loads matching the erection sequence rather than one crowded drop.
All eighteen trusses erected in two crane days with no site modification. The contractor has since placed three further orders.
Tell us what you need and we will come back with a scope, a timeline and a fixed price.