Roof trusses and purlins for a warehouse
Eighteen 14-metre trusses fabricated to engineer drawings, marked up for erection and delivered in the sequence the prog...
View projectA 96 square metre storage mezzanine with stairs and handrail, installed over a working workshop floor without stopping production.
Another workshop needed storage above their machining area but could not stop production to get it. We fabricated the whole platform off site and installed it in stages over three weekends.
Columns were positioned to miss the existing machine bases, which meant surveying the floor before the drawings rather than after.
Building over a live workshop floor, around fixed machine bases, without stopping production or dropping anything on someone else's plant.
Floor surveyed and column positions set to miss every machine base. Everything fabricated off site, then craned in and bolted up across three weekends with the shop closed.
96 square metres of storage gained with no production days lost. The client has since referred two further fabrication jobs to us.
Tell us what you need and we will come back with a scope, a timeline and a fixed price.
Start your projectEighteen 14-metre trusses fabricated to engineer drawings, marked up for erection and delivered in the sequence the prog...
View projectSend a drawing, a photograph, or just a description. You get a firm price, a lead time we can hold, and an honest word if there is a cheaper way to do it.